In 2015, Youngsun Wolfram Vietnam signed an energy audit contract with ITVC Global Co., Ltd. During the audit, the consultants assessed the full tungsten ore production line and the company’s energy consumption..

During the energy audit at Youngsun Wolfram Vietnam Industrial Co., Ltd., ITVC Global found that the company was already using energy relatively efficiently. Further improvement opportunities focused on medium-frequency furnaces, grinding equipment, dust extraction, water pumps and lighting.

Measures proposed during the audit

The figures are estimates in the project record at the time of the audit, not measured savings verified after implementation. Technologies and electricity prices need to be reassessed before applying these proposals today.

Measure in the project record Annual electricity savings Cost savings (VND/year)
Develop an ISO 50001:2011 energy management system 22,588 30,990,924
Replace 400 W metal-halide lamps with 250 W high-pressure sodium lamps 16,424 16,424,898
Replace 36 W T8 fluorescent lamps with 28 W T5 lamps 5,830 5,830,012
Replace a 15 kW pump with a 5 kW high-efficiency pump 27,433 37,638,641
Replace a 45 kW fan with a 12 kW fan 48,984 67,205,466

The original table does not specify the electricity unit; consult the audit report before using these figures in calculations. Pump and fan ratings must be selected according to actual flow, pressure and process requirements.

Project photographs

Thermal system survey at Youngsun Wolfram Vietnam.
Thermal system survey at Youngsun Wolfram Vietnam.
Electrical measurements at Youngsun Wolfram Vietnam; the original photograph and instrument display are retained.
Electrical measurements at Youngsun Wolfram Vietnam; the original photograph and instrument display are retained.

These proposals show that improvement opportunities can arise from both operating practices and equipment selection. Investment priorities should reflect feasibility, production impacts and recalculated benefits.

ITVC GLOBAL · SERVICE ENQUIRIES

Discuss energy audits and energy-saving plans with ITVC

Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.

Send a service request →

Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com

Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.




Copyright © 2014 ICTV. All Rights Reserved.

tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong

0914 564 579