CÔNG TY TNHH ITVC TOÀN CẦU

Ngôn ngữ: vien

0914 564 579

Giờ làm việc: 08:00–17:00 (Thứ 2–Thứ 7)


Energy and greenhouse gases

Repeat energy audit at Chinfon Cement in 2022

2026-09-28 06:09:55 | Lượt xem: 3 | Energy and greenhouse gases

Chinfon Cement is a longstanding major client of ITVC Global. In 2022, ITVC Global again provided energy auditing services at Chinfon Cement Plant in Hai Phong.

Project report from 2022. Figures, proposed measures and the 2020 reference document are retained in their original context; equipment proposals need assessment against the actual system conditions.

At the time of this project report, Chinfon Cement was described as one of Vietnam's leading cement producers, with two high-capacity production lines and an effective foreign-invested operation. Alongside production capacity, the company invested in environmental management and energy-saving programmes.

With an investment of USD 20.5 million, Chinfon installed a system that uses waste heat from cement production to generate electricity. Its design generating capacity was 12.8 MW. The original report described it as one of the first and largest cement-plant waste-heat power systems in Vietnam in 2014. 

Chinfon Cement Plant in the 2022 project report.
Chinfon Cement Plant in the 2022 project report.

Energy-saving measures already implemented

Chinfon used a three-year energy-audit cycle to review energy-consuming systems and energy accounting. The report described the following measures already being implemented:

  1. Gradually replacing high-pressure sodium and mercury lamps with LEDs.
  2. Using daylight in production buildings and warehouses.
  3. Recovering waste heat to generate electricity for production.
  4. Shifting suitable electricity consumption from peak to off-peak periods.
  5. Installing variable-speed drives on conveyor motors and large fans.
  6. Regularly inspecting and controlling compressed-air leaks at quick-connect fittings.
  7. Setting air conditioning to 26°C or above under the project approach.
  8. Specifying modern, efficient equipment from the outset, under management's purchasing direction.

Recommendations from the 2022 audit

In its 2022 energy audit, ITVC Global proposed the following energy-saving measures:

  1. Establish an energy management system based on ISO 50001:2018.
  2. Replace 36 W T8 fluorescent lamps with 18 W T8 LED tubes.
  3. Replace 250 W high-pressure sodium lamps with 150 W LED luminaires.
  4. Replace 250 W mercury lamps with 150 W LED luminaires.

Plant survey photographs

Original survey photographs of piping and electrical equipment at the plant.
Original survey photographs of piping and electrical equipment at the plant.
Original photographs of electrical measurements and process equipment during the survey.
Original photographs of electrical measurements and process equipment during the survey.

List of designated energy-intensive enterprises for 2020

Reference document:

CHÚNG TÔI RẤT VUI KHI ĐƯỢC CHIA SẺ TÀI LIỆU HỮU ÍCH NÀY VỚI BẠN

Quyết định số 1881/QĐ-TTg 2021

Danh sách doanh nghiệp tiêu thụ năng lượng trọng điểm 2020

Vui lòng điền đầy đủ thông tin và email chính xác, hệ thống sẽ tự động gửi tài liệu qua email!

ITVC GLOBAL · SERVICE ENQUIRIES

Discuss energy auditing with ITVC

Share your requirements and preferred timing. ITVC will review your enquiry and discuss a suitable service scope.

Send a service request →

Call for quotation: 0914 564 579
Ho Chi Minh City: 0859 553 986
Email: itvc.haiphong@itvc-global.com

Head office: 6th Floor, 22 Ly Tu Trong, Hong Bang Ward, Hai Phong, Vietnam.




Copyright © 2014 ICTV. All Rights Reserved.

tư vấn iso, tu van iso, kiểm toán năng lượng, kiem toan nang luong

0914 564 579